This project was carried out for a local parish council to renew an existing informal parking area with a more permanent solution.
Various options were explored providing disabled parking bays, electric vehicle charging points, CCTV and public realm enhancements and initially a tarmac hardstanding with surface water drainage solution. The aspiration was to not create any run-off into the existing Victorian road drainage system.
Through tendering and inflating prices during 2021 it was found that a proposal had to be created that could provide circa 320m2 of parking spaces at reduced costs. By using a GRASSCRETE solution no additional drainage measures were required. This brought the project value down to a more manageable level. This project is now expected to commence in 2022.